Metal Restoration

Dramatically Reduce Cooling Costs and Extend Roof Life

1. Surface Prep

  • Remove rust and corrosion with wire brush or wire wheel
  • Wash with TSP substitute and water; rinse or power wash, let dry

2. Prime

  • Where required use ERSystems® Acrylic Metal Rust Primer
  • Roof system must be clean and dry with surface temperature below 120°F at time of application
  • All underlying materials must be fully cured
  • Tighten all fasteners, seal all fasteners and seams with ERSystems® H.E.R. sealant

3. Repair & Seal

  • Replace missing fasteners
  • Tighten all fasteners, seal all fasteners and seams with ERSystems® H.E.R. urethane sealant

4. Finish Coat

  • Apply two coats of appropriate Elastek® topcoat
  • Apply with 3/4″ or 1-1/4″ nap roller or airless spray
  • Approximately 475 square feet per 5 gallon size pail per coat (approximately 100 square feet per gallon per coat). Apply two coats

Before & After Photo

metal 1

metal 2

Benefits

  • Reduce energy costs
  • Slow the aging process
  • Decrease future maintenance cost
  • Change the life cycle of the roof